Home r-arrow About Us r-arrow News r-arrow

END OF LINE TESTING ENSURES RELIABLE OPERATION

Every Valent unit is tested for an average of 90 minutes before it leaves the factory. This ensures a fast and trouble-free start-up and is an uncommon commitment to quality. What does Valent test before a product ships from the factory?

THOROUGH FACTORY RUN TEST

Before shipping, Valent performs the following tests on every unit:

  • Cooling system: All circuits on all compressors are run to verify that operating pressures and temperatures are within specifications. Coils are pressurized and held as a final leak check. Subcooling and superheat parameters are measured and adjusted as necessary.
  • Mechanical components: All mechanical components are cycled through their entire range to ensure proper operation. From fans and dampers to furnaces and compressors, full functionality is tested and confirmed.
  • Controls: Pre-engineered control sequences are loaded into the controller with factory defaults assigned. VFDs are programmed and tested. Sensor wiring and functionality are confirmed. Factory programming and controls testing makes field start-up a snap.

ENSURES EASY START-UP AND RELIABLE OPERATION

End of line testing enables a plug and play start-up process and ensures reliable operation. Simply connect necessary services like power and gas, enable unit operation from the unit controller, and go!

EndofLine_Tiny

Thorough factory run-testing ensures quick and easy start-ups and reliable operation.